The essential factors and underlying structure required for snack production projects.

6444
The essential factors and underlying structure required for snack production projects.

The food industry in general and the production of snacks (cookies, crackers, potato chips, popcorn) in particular are highly lucrative and widespread worldwide. By mid-2018, snack sales worldwide exceeded $85 billion, with the Arab region contributing over $13.5 billion. These products are among the most consumed and least harmful due to their lack of artificial or harmful ingredients. To start a similar project, the following requirements must be considered: the infrastructure of the factory, including its location, size, and necessary services such as electricity, water, and proper ventilation; the size of the production line, the capacity of the line, the number of packaging and wrapping machines, the storage area, and the size of the administrative structure of the facility; a minimum required size of the factory of 400 square meters; necessary permits and licenses from relevant authorities; and a marketing plan for the products.

In the following, we provide you with a brief overview of the project requirements:

Infrastructure of the project:

The factory, the facility or the place and the area on which the project will be built, which is one of the most important things on which the project is based, in addition to providing it with all the requirements (electricity - water - suitable ventilation).

The space required for the facility is determined according to the following factors:

Font size to play

Line production capacity

The number of packaging machines

Storage area or warehouse space

The size of the management structure of the facility

The area required for a similar project should not be less than 400 square meters on average, all you have to do is provide us with the dimensions of the facility and we at ZIRVE and through our specialized engineering staff will provide you with all the required plans and drawings for the locations of the production lines and equipment, in addition to all the places of electrical and water connections and all What the organization needs.

Qualified and trained human resources:

Also, the real development and success of any project requires trained and qualified human resources, so we are keen in ZIRVE that all our customers have trained and qualified human elements capable of controlling and operating machines and facing any problems that may occur with high professionalism, by providing our customers with a technical cadre to install and operate lines Production and intensive training of workers to ensure their ability to start work and production.

Raw materials and materials:

Certainly, it is considered one of the most important elements, as it plays an important and vital role in the production process, and the success of the final product depends in a high percentage on the appropriate selection of raw materials in terms of quality.

The following items are included in the raw materials required for production:

Crushed corn, which is the component that makes up the chips

Flavors of all kinds

hydrogenated vegetable oil

cellophane packaging

At ZIRVE, we are always committed to providing the best services to our customers by connecting them with the best suppliers of raw materials in various countries of the world with the highest quality and lowest possible cost.

video

test en
Food processing equipment manufacturers ZIRVE EXTRUSION group About company

CHIPS & SNACKS PRODUCTION LINES

Створено

Zirve Extrussion

We’ll reply as soon as possible